May 29, 2005
Ray sent this drive cage.
I'll cut it down and make it fit.
Laying out where to
cut down the drive cage.
This corner needs to be removed,
but that will loose needed structure.
A scrap piece from the drive cage
will be added for additional strength.
Patch piece cut to size and filed smooth.
The patch piece clamped in place
and screwed down with the self
taping screws.
The little corner has been removed.
The drives laid in the cage, and test
fitted in the case.
With everything cleaned of metal shavings; a test fit with the board
in place to check for clearance.
Mounting screws for the drives laid
out, drilled; and the drives attached.
Back to the Index Page
Forward to May 30, 2005
Copyright © 1996-2006 - Al Anger All Rights Reserved Worldwide